Scalable electric shuttle service for game days, concerts, and festivals. Fixed routes, real-time tracking, and professional operations for every event on your calendar.
Auburn University
University of North Alabama
Football, basketball, baseball, high-attendance sporting events with predictable arrival and departure surges. Fixed routes from remote lots to venue gates.
Large outdoor events where parking is remote or limited. Continuous shuttle loops from lots and transit hubs to venue entry points throughout the event.
Hotel-to-venue connections for multi-day conferences. Fixed schedule shuttles between official hotels and convention centers during event hours.
Campus parking connectors for high-attendance graduation weekends. Families park remotely and shuttle in, reducing congestion at the venue.
Seasonal fairs, community events, and public gatherings where temporary shuttle connections reduce traffic and improve the attendee experience.
Slidr handles route design, vehicle staging, driver coordination, and real-time oversight for every event. One point of contact, one contract. Your event staff focuses on the event: not the shuttle.
A 5,000-person festival needs different resources than an 87,000-seat stadium. Slidr scales the fleet to match expected attendance, adjusting vehicle count and staging areas for each event on your calendar.
High-volume events require experienced drivers who can work efficiently under time pressure and crowd conditions. Every Slidr driver is background-checked and trained for event operations.
Riders see every active vehicle on a live map and real-time ETAs at each pickup point. No standing in an unknown line, the app shows exactly where the next shuttle is and when it arrives.
Drivers follow their assigned route or pickup queue with clear stop-by-stop guidance. Passenger counts and timing are logged automatically on every run: no manual tracking during the rush.
Your operations team and Slidr staff monitor all active vehicles in real time. See vehicle locations, capacity, and run counts across all staging areas. Adjust dispatch as conditions change.

Total riders moved, vehicles deployed, run counts, and peak throughput per event. Use event-by-event data to right-size the fleet for future dates and report impact to venue management.

Live vehicle positions across all staging areas on event day. Adjust dispatch in real time when lots fill early or departure surges faster than expected. Full playback after the event for debrief and planning.
Yes. Auburn University's Tigers Unlimited uses Slidr to shuttle fans to and from Jordan-Hare Stadium, capacity 87,451, on game days. The fleet scales for each game based on expected attendance and scales down during the week.
Slidr right-sizes the fleet for each event based on expected attendance, venue layout, and parking lot configuration. Additional vehicles are staged for peak arrival and departure windows. Smaller events use a reduced fleet on the same operational infrastructure.
For a standalone event, Slidr typically needs 2 to 4 weeks to design the route, confirm the fleet, and coordinate logistics. Recurring events on a known calendar, a full football season, a concert series, can be planned further in advance with less per-event lead time.
Event shuttle pricing depends on fleet size, event duration, number of staging areas, and operational complexity. Contact Slidr for a quote specific to your event or venue.